Category | Environment Water | Location | Kuala Lumpur | Date | 07-Jun-2023 to 08-Jun-2023 | Price | RM 1,950.00 | Synopsis | Overview
Analysis of influent in terms of loading, concentration, volume, and timing against the capacity of the unit process and operation are very important to the IETS operation regardless it ina BP or PCP. It is directly related to the flow management whereby size of the tank, piping, pump capacity, and system maintenance play a major role to determine the best Hydraulic Retention Time (HRT) to ensure the IETS is effectively operating. HRT will determine whether the treatment reaction is enough or not to justify the effectiveness of the IETS operation. It is not only important to prevent overflow but to also ensure all the influent is well treated with proper loading setting based on the IETS capacity.Analysis of influent in terms of loading, concentration, volume, and timing against the capacity of the unit process and operation are very important to the IETS operation regardless it ina BP or PCP. It is directly related to the flow management whereby size of the tank, piping, pump capacity, and system maintenance play a major role to determine the best Hydraulic Retention Time (HRT) to ensure the IETS is effectively operating. HRT will determine whether the treatment reaction is enough or not to justify the effectiveness of the IETS operation. It is not only important to prevent overflow but to also ensure all the influent is well treated with proper loading setting based on the IETS capacity.
|
|